News

Record-breaking San Francisco Bay bridge opens

Record-breaking San Francisco Bay bridge opens

Vehicles drive on the new eastern span of the San Francisco-Oakland Bay bridge in San Francisco, California September 2, 2013. Photo: Reuters/REUTERS/Stephen Lam

By Laila Kearney

SAN FRANCISCO (Reuters) – The largest self-anchored suspension bridge in the world will open before Tuesday morning’s rush hour across San Francisco Bay, six years behind schedule and five times over budget.

The new $6 billion eastern section of the San Francisco-Oakland Bay Bridge, one of the busiest spans in the United States, is expected to be open on Tuesday for 280,000 daily commuters. The Bay Area Toll Authority said the bridge could open as soon as Monday night.

The San Francisco-to-Oakland bridge was shut to traffic last Wednesday to complete construction and build connections from the new eastern stretch to the existing toll plaza and the bay’s Yerba Buena Island.

The single-towered, 2,047-foot-long (634-metre) self-anchored main span is more than twice the length of the previous record holders, Japan’s Konohana Bridge and South Korea’s Yeongjong Grand Bridge, according to the Structurae engineering database.

A self-anchored suspension bridge has its main cables fixed to its deck. A traditional suspension bridge is anchored to the ground.

The opening follows years of delays prompted by design disputes, financial struggles and safety issues. It also comes two decades after its predecessor partly collapsed in a 1989 earthquake.

In March, a survey found that 32 of more than 2,300 steel rods used to help the 2.2-mile eastern span of the bridge withstand earthquakes were broken.

The cost of the retrofitting was estimated between $5 million and $10 million. Placeholder plate stabilizers are being used to keep the bridge open before the rods are permanently replaced in December.

The bridge will feature a single 525-foot tower and a bicycle path, points of contention when the bridge was being planned.

Once the new stretch is opened, it will take about three years to demolish the old span, bridge officials said in a statement.

The eastern section of the bridge reaches from Yerba Buena Island to Oakland. The western stretch links downtown San Francisco to the island.

The east span will include east- and westbound traffic on side-by-side decks. The west span will continue to have decks placed above and below one another.

Recent Headlines

in Sports

Aaron Hernandez trail delayed by bomb threat

Former New England Patriots football player Aaron Hernandez listens during a motion regarding jail phone recordings during his murder trial at the Bristol County Superior Court in Fall River, Mass., on Wednesday, March 25, 2015. Hernandez is accused in the June 2013 killing of Odin Lloyd.

A bomb threat has delayed proceedings of the Aaron Hernandez murder trial.

in National, World

Prosecutor: Germanwings co-pilot appeared to want to ‘destroy the plane’

germanwings

The co-pilot of the airliner that crashed in the French Alps, killing all 150 people aboard, appears to have brought the plane down deliberately.

in National, World

PHOTOS: Crash of Germanwings Flight 9525

AP41207304817_9

All 150 people on board the jet - including three Americans - were killed Tuesday when it crashed in the French Alps.

in Lifestyle

Eyes on the road: AAA says distracted driving worse than we thought

driving

You know how some people insist they can drive safely — even while they fiddle with their smartphones or other electronic devices? They can't.

in Sports

GPS can’t help Cubs pitcher find his way

edwinjackson

You've heard of baseball pitchers who have trouble finding the plate. How about a pitcher who can't even find the ballpark?